Background
A couple of enthusiasts in the housing association had been evaluating different solar energy solutions for some time. When EnergiEngagemang’s documentation was presented to the association, the response was surprisingly positive and a joint decision was quickly made.
Solution
The photovoltaic system was installed at the same time as an extensive roof renovation. Brick-colored concrete tiles were chosen and a total of 210 solar panels were placed evenly over the entire roof with a margin for shade from chimneys and ventilation pipes.
Result
BRF Furan’s solar cell plant is one of the larger ones in Oxelösund and has already been recognized by receiving an award from the municipality for its initiative. Hopefully, more will follow.